Our demolition works have been underway in various sections of the school over the last few months at Guisley School.

Moor Allerton Golf Club September/October 2026
Following a bulk fill operation to form the 27th hole and surrounding areas by a previous contractor, Fastsource Ltd were employed to do some re-shaping and final trimming, including topsoil dressing.
The works consisted of re-shaping the 27th hole using our GPS equipped dozer and a model supplied by the course designer and utilising site won topsoil to lay the final dressing.
In preparation for being laid to wild flower the remaining bulk fill areas were then re-shaped to suit the course managers specification including the removal of the haul Rd and former site offices.
In total an area of 40,000 square meters were re distributed and shaped to level with 20,000 square meters being laid with top soil and the remaining prepared for wild flower seeding.
The images below the show, before, during and after works.